Skid-Mounted Unit
Location: West Paydar- Ilam Province
Capacity: 25,000 barrel per day
Project Specification:
This project was accomplished for the dehydration of crude oil produced from the Paydar West field, which is a common oil field with Iraq. The engineering, procurement, construction, and commissioning of this unit were accomplished using 100% domestic capabilities from reputable local companies.
After the commissioning of this unit, 50% of the produced water from the field has been separated, and the dehydrated crude oil is transported via transfer pumps to the Cheshmeh Khosh Central production facility.
Duration of Project construction: 1 year